Construction Passes Halfway Mark at 300 N. Michigan Avenue
YIMBY reports that structural work has surpassed the 25th floor of the 47 floor tower and that glass is being installed on the 6th and 7th floors.
YIMBY reports that structural work has surpassed the 25th floor of the 47 floor tower and that glass is being installed on the 6th and 7th floors.